Mid-August Highway Roadwork ...Middle East

myMOTHERLODE - News
Mid-August Highway Roadwork

Here are the Caltrans road projects that are planned for the week beginning Sunday, August 17th to the 23th in Tuolumne and Calaveras Counties.

On Highway 4 there will be one-way traffic control from Bonanza Mine Way to Appaloosa Road for highway construction work Monday through Thursday from 7 a.m. until 5 p.m. and Friday from 7:00 a.m. until 3:00 p.m.

    On Highway 4 one-way traffic control from Darby Russel Road to Avery Hotel Road will allow for drainage work beginning Tuesday through Thursday from 8 a.m. until 3 p.m.

    On Highway 26 one-way traffic control at South Fork Mokelumne River Bridge for highway construction work Monday through Thursday from 6:00 a.m. until 4:00 p.m., and on Friday from 6:00 a.m. until 3:00 p.m.

    On Highway 26 long-term, one-way traffic control from Gill Haven Drive to Rich Gulch Lane for highway construction work continues.

    On Highway 108 a moving, alternating lane closure between North Tuolumne Road in Twain Harte and Forest Route 5N32 will allow for a sweeping operation beginning Monday through Thursday from 9 a.m. until 4 p.m.

    On Highway 120 the long-term, full closure of the vista points on either side of the James E. Roberts Memorial Bridge overlooking Don Pedro Reservoir will allow for construction work Monday through mid-September

    On Highway 120 overnight, one-way traffic control between Scofield Street in Big Oak Flat and Deer Flat Road in Groveland for utility work beginning Sunday through Friday from 9 p.m. until 6 a.m.

    For non Caltrans managed roadwork visit our local traffic news story list.

    Motorists should expect 5 to 10-minute delays and use alternate routes whenever possible.

    This work is scheduled to take place as listed, but is subject to change due to traffic incidents, weather, availability of equipment, and/or materials and construction related issues. For the safety of workers and other motorists, please Be Work Zone Alert.

    Hence then, the article about mid august highway roadwork was published today ( ) and is available on myMOTHERLODE ( Middle East ) The editorial team at PressBee has edited and verified it, and it may have been modified, fully republished, or quoted. You can read and follow the updates of this news or article from its original source.

    Read More Details
    Finally We wish PressBee provided you with enough information of ( Mid-August Highway Roadwork )

    Apple Storegoogle play

    Last updated :

    Also on site :