Ashghal completes stormwater drainage network to serve areas in Doha West ...Qatar

Gulf Times - News
Ashghal completes stormwater drainage network to serve areas in Doha West
The Public Works Authority 'Ashghal' announced the completion of the stormwater drainage network which serves four areas in Doha West: Fereej Al-Manaseer, South Muaither, Bu Sidra, and Al-Sailiya until Al Furousiya Street. The newly completed network comes as part of Ashghal's strategy to preserve the environment and public health and safety. Project Engineer at Ashghal's Roads Projects Department Eng. Mohamed Al Ateeg said that the pipe laying works for the stormwater drainage network were carried out at a total length of 4.4 km and a depth ranging between 10m - 18m underground, the scope of works also involved providing 28 rainwater drainage outlets connected to ground pipes, which in t

Hence then, the article about ashghal completes stormwater drainage network to serve areas in doha west was published today ( ) and is available on Gulf Times ( Qatar ) The editorial team at PressBee has edited and verified it, and it may have been modified, fully republished, or quoted. You can read and follow the updates of this news or article from its original source.

Read More Details
Finally We wish PressBee provided you with enough information of ( Ashghal completes stormwater drainage network to serve areas in Doha West )

Apple Storegoogle play

Last updated :

Also on site :