GNWT concludes Hay River Harbour restoration work for 2023 ...Middle East

canadian news today - News
GNWT concludes Hay River Harbour restoration work for 2023
The Government of the Northwest Territories (GNWT) has completed work for the 2023 season to dredge an emergency navigable channel in the Hay River Harbour, a critical link in the territory’s transportation network. The long-standing navigation channel in the Hay River Harbour has been affected by natural and on-going sedimentation, which in combination with extremely low water levels has challenged the movement of vessels in this area. The intent of the project is to create a 30-metre-wide by 2.4-metre-deep emergency navigable channel to allow safe passage of marine vessels to and from the Hay River Harbour.  The dredging work began in early August but was paused due to the Hay River evac

Hence then, the article about gnwt concludes hay river harbour restoration work for 2023 was published today ( ) and is available on canadian news today ( Middle East ) The editorial team at PressBee has edited and verified it, and it may have been modified, fully republished, or quoted. You can read and follow the updates of this news or article from its original source.

Read More Details
Finally We wish PressBee provided you with enough information of ( GNWT concludes Hay River Harbour restoration work for 2023 )

Apple Storegoogle play

Last updated :

Also on site :



Latest News