Site identified in Dubai for UAE’s first wind farm ...United Arab Emirates

ME CONSTRUCTION NEWS - Local News
An area in Hatta has been identified as the site for the UAE’s first wind farm under a feasibility study to develop a 28mW generation unit. Using preliminary data and following wind studies and field visits, the site was selected in the Hatta mountain area where actual wind speeds are currently being measured for a full year using a 150m tower. The feasibility study being conducted will enable the Dubai Electricity & Water Authority (Dewa) to assess the total capacity of the wind farm and technical elements, such as the number of turbines and average annual operating hours. Saeed Mohammed Al-Tayer, MD & CEO of Dewa, said: “The project to generate electricity using wind power is part of our e

Hence then, the article about site identified in dubai for uae s first wind farm was published today ( ) and is available on ME CONSTRUCTION NEWS ( United Arab Emirates ) The editorial team at PressBee has edited and verified it, and it may have been modified, fully republished, or quoted. You can read and follow the updates of this news or article from its original source.

Read More Details
Finally We wish PressBee provided you with enough information of ( Site identified in Dubai for UAE’s first wind farm )

Apple Storegoogle play

Last updated :

Also on site :

Most viewed in Local News


Latest News