Egypt Targets July 2027 for Ain Sokhna-Matrouh High-Speed Rail Service ...Egypt

Egyptian Streets - News
Egypt Targets July 2027 for Ain Sokhna-Matrouh High-Speed Rail Service

Egypt is targeting July 2027 to begin passenger operations on the first line of its high-speed electric railway network, connecting Ain Sokhna on the Red Sea with Marsa Matrouh on the Mediterranean, Minister of Transport Kamel El-Wazir said on Wednesday, 30 September. Speaking during a phone interview with state-run Channel One’s ‘Men Maspero’ programme, El-Wazir said the 660-kilometre line will include 21 stations and a central control centre. The route will connect Ain Sokhna with Cairo, Alexandria, New Alamein, and Marsa Matrouh, serving residential areas, tourist destinations, industrial zones, and logistics hubs along the way. Official project updates describe the line as part of the Sokhna-Alexandria logistics corridor, which is intended to connect Red Sea and Mediterranean ports with industrial and logistics areas. El-Wazir said high-speed trains on the line will operate at speeds of up to 250 kilometres per hour, with journeys between Cairo and Marsa Matrouh expected to take between two and two-and-a-half hours. Travel between Ain Sokhna and Marsa Matrouh is expected to take between three and three-and-a-half hours. The line will operate different services for passengers and freight. High-speed trains will travel at up to 250Continue reading "Egypt Targets July 2027 for Ain Sokhna-Matrouh High-Speed Rail Service"

Egypt Targets July 2027 for Ain Sokhna-Matrouh High-Speed Rail Service first appeared on Egyptian Streets.

    Hence then, the article about egypt targets july 2027 for ain sokhna matrouh high speed rail service was published today ( ) and is available on Egyptian Streets ( Egypt ) The editorial team at PressBee has edited and verified it, and it may have been modified, fully republished, or quoted. You can read and follow the updates of this news or article from its original source.

    Read More Details
    Finally We wish PressBee provided you with enough information of ( Egypt Targets July 2027 for Ain Sokhna-Matrouh High-Speed Rail Service )

    Apple Storegoogle play

    Last updated :

    Also on site :

    Most viewed in News