Phase 1 of Al Quoz sewerage and stormwater project complete says Dubai Municipality ...United Arab Emirates

ME CONSTRUCTION NEWS - Local News
Phase 1 of Al Quoz sewerage and stormwater project complete says Dubai Municipality

Phase 1 of the Sewerage and Stormwater Network Development Project in Al Quoz Creative Zone, has been completed according to Dubai Municipality at a cost of US $68.1mn, with the total investment in the project said to be $136.1mn. The Al Quoz Creative Zone is said to be one of Dubai’s most dynamic and economically active areas.

The project aims to develop an integrated, adaptable, and sustainable sewerage and stormwater system serving Al Quoz Industrial Areas 1, 2, 3, and 4, as well as the area located between Sheikh Zayed Road and Al Khail Road. It spans a total area of 1,600ha and covers more than 1,507 plots.

    His Excellency Marwan Ahmed bin Ghalita, Director General of Dubai Municipality said, “The Sewerage and Stormwater Network Development Project in Al Quoz is one of Dubai Municipality’s key strategic projects to enhance the efficiency, resilience, and operational readiness of the emirate’s infrastructure systems. It supports Dubai’s ongoing urban and population growth, reinforces its position as a global leader in sustainable urban planning, and strengthens the future readiness of its infrastructure, making Dubai a more attractive, sustainable, and liveable city.”

    “The project enhances the efficiency of sewerage and stormwater infrastructure systems in Al Quoz Creative Zone and supports its integrated urban model. It will further strengthen the area’s appeal as a vibrant hub for economic and investment activity, while keeping pace with the emirate’s future development requirements,” he added.

    Phase 1 included the construction of sewerage and stormwater drainage networks covering 155ha and 123 plots. Supporting the emirate’s sustainable sewerage infrastructure, Dubai Municipality delivered sewerage networks adding up to a length of 15km, with pipe diameters ranging from 160mm to 1,600mm. The works also included the development of an integrated stormwater drainage network extending 14km, with pipe diameters ranging from 200mm to 3,000mm.

    This project forms part of the emirate-wide Sewerage System Development Programme, which aims to transform the system into a more sustainable, innovative, and efficient network. It also aligns with the Tasreef programme for stormwater drainage development, valued at $30bn – the largest unified stormwater collection system in the region and one of the most operationally efficient – designed to increase drainage capacity by 700% for the next 100 years.

    Adel Mohammed Al Marzouqi, CEO of the Waste and Sewerage Agency at Dubai Municipality noted, “This project contributes to enhancing the efficiency of the rainwater drainage system and the smooth flow of water in the Al Quoz Creative Zone, while reducing water accumulation. This ensures the continuity of services and business operations and supports the city’s resilience and preparedness to face various future climatic conditions.”

    Dubai Municipality said that it will continue to implement transformative infrastructure projects that strengthen the emirate’s resilience to future environmental challenges, enhance operational efficiency, and ensure service continuity in line with urban and population growth.

    These efforts support Dubai’s transition towards a smart and sustainable city model, aligned with national agendas and the leadership’s vision to position Dubai as a global benchmark for infrastructure quality and public services, it added.

    Phase 1 of Al Quoz sewerage and stormwater project complete says Dubai Municipality Middle East Construction News.

    Hence then, the article about phase 1 of al quoz sewerage and stormwater project complete says dubai municipality was published today ( ) and is available on ME CONSTRUCTION NEWS ( United Arab Emirates ) The editorial team at PressBee has edited and verified it, and it may have been modified, fully republished, or quoted. You can read and follow the updates of this news or article from its original source.

    Read More Details
    Finally We wish PressBee provided you with enough information of ( Phase 1 of Al Quoz sewerage and stormwater project complete says Dubai Municipality )

    Apple Storegoogle play

    Last updated :

    Also on site :

    Most viewed in Local News


    Latest News