Energy Minister Mohammad al-Bashir said that after a 15-year suspension, the first and second generating units at the Taim power plant in Deir Ezzor have been successfully restarted to serve residents of the province, the statement was posted Monday on X
Al-Bashir described the move as a “qualitative step” toward reinforcing the stability of the national electricity grid in eastern Syria.
The minister expressed appreciation to engineers, technicians and maintenance teams who contributed to the rehabilitation work that made the restart possible.
Hence then, the article about power restored at deir ezzor s taim plant after 15 year shutdown was published today ( ) and is available on SANA ( Syria ) The editorial team at PressBee has edited and verified it, and it may have been modified, fully republished, or quoted. You can read and follow the updates of this news or article from its original source.
Read More Details
Finally We wish PressBee provided you with enough information of ( Power restored at Deir Ezzor’s Taim plant after 15-year shutdown )
Also on site :
- Ukraine-Russia war latest: Zelensky awaits Putin response to new peace plan while Christmas Eve blast kills 3 in Moscow
- JCPenney Has a 'Stunning' White Sapphire Jewelry Set on Sale for Just $16, and It's Perfect for Every Occasion
- China's First Domestic Anti-CTLA-4 Monoclonal Antibody, Innovent's TABOSUN® (Ipilimumab N01 Injection) Received NMPA Approval
