SECOND DEEP DRILL HOLE INTERCEPTS 1,000 METRES OF MINERALISATION GRADING 2.6% TREO ...Middle East

PR Newswire - News
SECOND DEEP DRILL HOLE INTERCEPTS 1,000 METRES OF MINERALISATION GRADING 2.6% TREO
HIGHLIGHTS 1,000 metres at 2.6% TREO in KGKDD009 with multiple standout intercepts including: 805.26 metres @ 2.90% TREO from 152.85 metres, including 652.41 metres @ 3.0% TREO from 347.59 metres to end of hole (EOH), ~700 metres below base of current resource estimate, including 288...

Hence then, the article about second deep drill hole intercepts 1 000 metres of mineralisation grading 2 6 treo was published today ( ) and is available on PR Newswire ( Middle East ) The editorial team at PressBee has edited and verified it, and it may have been modified, fully republished, or quoted. You can read and follow the updates of this news or article from its original source.

Read More Details
Finally We wish PressBee provided you with enough information of ( SECOND DEEP DRILL HOLE INTERCEPTS 1,000 METRES OF MINERALISATION GRADING 2.6% TREO )

Apple Storegoogle play

Last updated :

Also on site :



Latest News