Al-Bahar completes power solutions project for rig builder Lamprell ...United Arab Emirates

ME CONSTRUCTION NEWS - Local News
Al-Bahar completes power solutions project for rig builder Lamprell
Cat dealer Mohamed Abdulrahman Al-Bahar recently completed the commissioning of integrated power solutions for the first of the two new offshore jack-up rigs building projects executed by Lamprell, the UAE-based rig builder and provider of services to the international energy sector. Lamprell turned to Al-Bahar for Cat generator sets after the company received a letter of intent from the International Maritime Industries (IMI) in December 2018 for the construction and delivery of two Jack Up drilling rigs, based on the proven LeTourneau Super 116E Self-elevating Mobile Offshore Drilling Unit (MODU) design. When the first order was formalised in January 2020, for Lamprell by IMI, Caterpillar

Hence then, the article about al bahar completes power solutions project for rig builder lamprell was published today ( ) and is available on ME CONSTRUCTION NEWS ( United Arab Emirates ) The editorial team at PressBee has edited and verified it, and it may have been modified, fully republished, or quoted. You can read and follow the updates of this news or article from its original source.

Read More Details
Finally We wish PressBee provided you with enough information of ( Al-Bahar completes power solutions project for rig builder Lamprell )

Apple Storegoogle play

Last updated :

Also on site :

Most viewed in Local News


Latest News
before 4 hours & 47 minute