Ethiopian Minister of Irrigation Seleshi Bekele announced on Sunday that the lower exits of the Grand Ethiopian Renaissance Dam (GERD) have begun operating, with a total capacity of 1,860 cubic meters per second, in preparation for the dam’s second filling in July. The dam was designed in a manner that will meet the water needs of downstream countries without causing any kind of harm to them, he added. On Thursday, the Ethiopian Foreign Ministry confirmed that the process of filling the dam will take place on time and that there is no justification for Sudan’s objection to its filling an operation, adding that an initiative to exchange data on the dam with Sudan and Egypt has been initiated
Hence then, the article about gerd lower exits begin operation in preparation for july filling ethiopia was published today ( ) and is available onEGYPT INDEPENDENT ( Egypt ) The editorial team at PressBee has edited and verified it, and it may have been modified, fully republished, or quoted. You can read and follow the updates of this news or article from its original source.
Read More Details Finally We wish PressBee provided you with enough information of ( GERD lower exits begin operation in preparation for July filling: Ethiopia )