Cairo Metro Line III reaches 49% completion mark ...United Arab Emirates

Local News by : (ME CONSTRUCTION NEWS) -
Kamel El-Wazir, the Egyptian Minister of Transport, announced that the third phase of the Cairo Metro Line III has reached a completion rate of 49%. The total cost of the third phase, which has a length of 17.7 km is estimated at $2.6 billion, according to the minister. The third phase of the metro line comprises of 15 stations, and is being built by a joint venture of Dubai- and Egypt-listed Orascom Construction and Arab Contractors Company, respectively. Once complete, the Cairo Metro Line III will connect Greater Cairo to the 6th of October City, the New Administrative Capital, and the cities of El Shorouk, El Obour, and El Mostaqbal. The minister stated that the first part of the phase t

Hence then, the article about cairo metro line iii reaches 49 completion mark was published today ( ) and is available on ME CONSTRUCTION NEWS ( United Arab Emirates ) The editorial team at PressBee has edited and verified it, and it may have been modified, fully republished, or quoted. You can read and follow the updates of this news or article from its original source.

Read More Details
Finally We wish PressBee provided you with enough information of ( Cairo Metro Line III reaches 49% completion mark )

Last updated :

Also on site :

Most Viewed Local News
جديد الاخبار