Infrastructure Bank lost $900,000 on shelved climate project: Report ...Middle East

News by : (canadian news today) -
Breadcrumb Trail Links Canada Lake Erie Connector proposed in 2021 before being scrapped a year later Published Jan 08, 2024  •  1 minute read The Canada Infrastructure Bank lost $899,318 investing in the Lake Erie Connector, which proposed running a 117-km underwater electricity transmission line under Lake Erie from Ontario to Pennsylvania. Photo by iStockphoto /Getty Images Article content The Canada Infrastructure Bank acknowledged in an inquiry of ministry tabled in the House of Commons that it lost almost $900,000 in consultant fees on a failed climate project, according to Blacklock’s Reporter. Advertisement 2 This advertisement has not loaded yet, but your ar

Hence then, the article about infrastructure bank lost 900 000 on shelved climate project report was published today ( ) and is available on canadian news today ( Middle East ) The editorial team at PressBee has edited and verified it, and it may have been modified, fully republished, or quoted. You can read and follow the updates of this news or article from its original source.

Read More Details
Finally We wish PressBee provided you with enough information of ( Infrastructure Bank lost $900,000 on shelved climate project: Report )

Last updated :

Also on site :

Most Viewed News
جديد الاخبار