Fujiyama Power to set up 1.2 GW solar plant in MP to strengthen value chain ...Middle East

Economy by : (Business Standard) -
Solar energy and power backup solutions provider Fujiyama Power Systems is setting up a 1.2 GW solar cell manufacturing facility in Madhya Pradesh as part of its 2030 vision to become an integrated renewable energy player, its MD Pawan Garg said. The greenfield project is expected to start solar cell production using advanced TopCon technology by the end of the ongoing fiscal year, the official told PTI in an interaction. Post start of the commercial operations, the company's total cell capacity will reach 2.3 GW. Fujiyama operates a 1.1 GW cell plant in Dadri, Uttar Pradesh. Tunnel Oxide Passivated Contact (TOPCon) technology is more efficient than conventional solar cell architectures, specifically Passivated Emitter and Rear Cell (PERC). "We are setting up a new 1.2 GW solar cell manufacturing plant at Ratlam in Madhya Pradesh. This backward integration project will strengthen our value chain, reducing dependence on the open market," Garg said. The project is being set up with

Hence then, the article about fujiyama power to set up 1 2 gw solar plant in mp to strengthen value chain was published today ( ) and is available on Business Standard ( Middle East ) The editorial team at PressBee has edited and verified it, and it may have been modified, fully republished, or quoted. You can read and follow the updates of this news or article from its original source.

Read More Details
Finally We wish PressBee provided you with enough information of ( Fujiyama Power to set up 1.2 GW solar plant in MP to strengthen value chain )

Last updated :

Also on site :

Most Viewed Economy
جديد الاخبار