Here are the Caltrans road projects that are planned for the week beginning Sunday, December 14th to the 21st in Calaveras County. There is no scheduled Caltrans work for Tuolumne County.
On Highway 49 one-way traffic control from South Bret Harte/Sam’s Way to Copello Drive (Left) will allow for roadway excavation on Monday from 7 a.m. to 5 p.m. The rest of the week, from Tuesday to Friday the work will be at night from 9:00 p.m. to 7:00 a.m. South Bret Harte/Sam’s Way to Copello Drive.
On Highway 4 long-term, one-way traffic control continues from Appaloosa Road to Stallion Way. The pavement work will continue as currently scheduled through Wednesday, December 31, 2025.
On Highway 26 long-term, one-way traffic control from Gill Haven Drive to Rich Gulch Lane for highway construction work will continue as currently scheduled through Wednesday, December 31, 2025.
On Highway 26 two areas of tree work will limit traffic to one-way in West Point. The traffic control takes place from Main Street West to Bucksaw Lane on Monday and Tuesday and from Railroad Flat Road to Main Street/West in West Point on Wednesday. All three days the work will be from 8:00 a.m. until 5:00 p.m.
Motorists should expect 5 to 10-minute delays and use alternate routes whenever possible.
This work is scheduled to take place as listed, but is subject to change due to traffic incidents, weather, availability of equipment, and/or materials and construction related issues. For the safety of workers and other motorists, please Be Work Zone Alert.
For non Caltrans managed roadwork visit our local traffic news story list.
Hence then, the article about road work planned for mid december was published today ( ) and is available on myMOTHERLODE ( Middle East ) The editorial team at PressBee has edited and verified it, and it may have been modified, fully republished, or quoted. You can read and follow the updates of this news or article from its original source.
Read More Details
Finally We wish PressBee provided you with enough information of ( Road Work Planned for Mid-December )
Also on site :
- China's First Domestic Anti-CTLA-4 Monoclonal Antibody, Innovent's TABOSUN® (Ipilimumab N01 Injection) Received NMPA Approval
- The shadow Russia casts over Europe has forced it to face the truth: the risk of war is once again real
- Goldman Sachs expects layoffs to keep rising—and says investors are punishing the stocks of companies that slash staff