Delivering Abu Dhabi’s sustainable ambitions ...United Arab Emirates

Local News by : (ME CONSTRUCTION NEWS) -
In April 2024 it was announced that the integrated joint venture (JV) between ALEC Engineering & Contracting (ALEC) and BUTEC had been selected to build a waste-to-energy (WtE) plant in Abu Dhabi. The project is being driven by a special purpose vehicle (SPV) – Al Bihouth Waste to Energy Developer Holding Co Ltd – which is a consortium comprising Hitachi Zosen Inova, Marubeni, JOIN and TADWEER. The plant will be the first facility of its kind in the UAE’s capital, with the ultra-large incineration facility being developed to process 900,000 tonnes of non-recyclable waste annually over the next 30 years. Located near the Al-Dhafra landfill, the project aims to prevent the release of nearly 1.

Hence then, the article about delivering abu dhabi s sustainable ambitions was published today ( ) and is available on ME CONSTRUCTION NEWS ( United Arab Emirates ) The editorial team at PressBee has edited and verified it, and it may have been modified, fully republished, or quoted. You can read and follow the updates of this news or article from its original source.

Read More Details
Finally We wish PressBee provided you with enough information of ( Delivering Abu Dhabi’s sustainable ambitions )

Last updated :

Also on site :

Most Viewed Local News
جديد الاخبار