Herrenknecht delivers 17.5m diameter TBM for China infrastructure project ...United Arab Emirates

Local News by : (ME CONSTRUCTION NEWS) -
A Mixshield tunnel boring machine (TBM) has been delivered by Herrenknecht for the construction of a 3.3km two-storey road tunnel with three lanes in each direction. The project is taking shape in Jinan, China. The order for the Herrenknecht Tunnelling Machinery (HTM) was for a machine to cross under the Yellow River in Jinan, in a geological environment with high groundwater pressure, and to create just one tunnel tube for both directions of travel. Given the requirements, a large diameter was required: 17.5m. The TBM’s 5,600kW cutterhead drive delivers 35,017kNm of torque, said a report. Mixshield technology is said to be designed for the extreme conditions of tunnelling under the Yellow R

Hence then, the article about herrenknecht delivers 17 5m diameter tbm for china infrastructure project was published today ( ) and is available on ME CONSTRUCTION NEWS ( United Arab Emirates ) The editorial team at PressBee has edited and verified it, and it may have been modified, fully republished, or quoted. You can read and follow the updates of this news or article from its original source.

Read More Details
Finally We wish PressBee provided you with enough information of ( Herrenknecht delivers 17.5m diameter TBM for China infrastructure project )

Last updated :

Also on site :

Most Viewed Local News
جديد الاخبار