Doosan Enerbility wins US $114mn equipment contract for Saudi power plants ...United Arab Emirates

Local News by : (ME CONSTRUCTION NEWS) -
Energy solution provider Doosan Enerbility has announced that it has secured a contract worth US $114mn contract to supply equipment for Saudi Arabia’s largest combined-cycle power plant project. As per the terms of the deal, the firm will supply two 650MW steam turbines and generators for the Qassim 1 and Taiba 1 power plants, with a combined capacity of 3,600MW. The plants, which are located 200km north of Jeddah and 200km northwest of Riyadh, are expected to be operational by 2027. The projects are being developed by a consortium of Saudi Electricity Company and ACWA power. According to a report, the agreement was reached with China’s Sepco-3, which is responsible for the engineering, pr

Hence then, the article about doosan enerbility wins us 114mn equipment contract for saudi power plants was published today ( ) and is available on ME CONSTRUCTION NEWS ( United Arab Emirates ) The editorial team at PressBee has edited and verified it, and it may have been modified, fully republished, or quoted. You can read and follow the updates of this news or article from its original source.

Read More Details
Finally We wish PressBee provided you with enough information of ( Doosan Enerbility wins US $114mn equipment contract for Saudi power plants )

Last updated :

Also on site :

Most Viewed Local News
جديد الاخبار