ISS Daily Summary Report – 8/22/2023 ...Middle East

Cultural by : (NASA) -
Payloads: Flow Boiling and Condensation Experiment (FBCE): FBCE Avionics 1 was replaced within the Fluids Integrated Rack (FIR) and test fluid was refilled. A test Module data cable was left capped as the connector was clocked 180 degrees from the expected configuration. Ground teams are assessing to address this issue. FBCE seeks to validate a …

Hence then, the article about iss daily summary report 8 22 2023 was published today ( ) and is available on NASA ( Middle East ) The editorial team at PressBee has edited and verified it, and it may have been modified, fully republished, or quoted. You can read and follow the updates of this news or article from its original source.

Read More Details
Finally We wish PressBee provided you with enough information of ( ISS Daily Summary Report – 8/22/2023 )

Last updated :

Also on site :

Most Viewed Cultural
جديد الاخبار